25, PP. 1415-1429, 1987.
Rees, L. P., Huang, P. Y., and Taylor 111, B.

Comparative Analysis of an MRP Lot-for-lot
System and a Kanban System for a Multistage

Production Operation,”lnternational Joumal of Production Research, vol. 27, PP. 1427-1443, 1989.
50752619781961

Philipoon, P. R., Rees L. P., Taylor 111, B.w., and Huang, P. Y.,t’An Investigation of the Factors Influencing the Number of Kanbans Required in the Implementation of the JIT,” Intemational joumal of productiopn Research, Vol. 25, PP. 457-472, 1987.
Gravel, M., and Price, W. the Kanban in

a Job Shop Environment,” Intemational Joumal of

Production Research, vol. 26, PP. 1105-1118 , 1988.
Sarker, B. R., and Fitzsimmons, J. A.,”The Per -formance of Push and Pull Systems: a Simulation and Comparative Study,” International Journal of Production Research , vol. 27., PP. 1715-1731, 1989. 19. Andijani, A A, and Clark, G.

All

در این سایت فقط تکه هایی از این مطلب با شماره بندی انتهای صفحه درج می شود که ممکن است هنگام انتقال از فایل ورد به داخل سایت کلمات به هم بریزد یا شکل ها درج نشود

شما می توانید تکه های دیگری از این مطلب را با جستجو در همین سایت بخوانید

ولی برای دانلود فایل اصلی با فرمت ورد حاوی تمامی قسمت ها با منابع کامل

اینجا کلیک کنید

All

-ocation to Serial production Lines in a Stochastic Environment. In: JIT Manufacturing Systems: Operational Planning and Control Issues,” A. Satir (ed.)(Amsterdam: Elsevier), 175-190, 1991.
Sumichrast, R. T., Russell, R. S., and Taylor Ill B. W.,”A Comparative Analysis of Sequencing Proce -dures for Mixed Model Assembly Lines in a JIT

Production System,” International Joumal of Production Research, vol. 30, PP. 199-214, 1992.

Yavuz, I. H., and Satir, A., “A Kanban – based

Simulation Study of a Mixed Model Just-in-time Manufacturing Line,” International Journal of

Production Research, vol. 33, PP. 1027-1048, 1995.


دیدگاهتان را بنویسید